Enter any required information into the dynamic fields.
The dynamic fields have been set up based on the email type. i.e. For an Extension of Time, the default fields are Requested ByDate,and the option to include Addons.
Enter the date you would like a response by.
Click on Addons to include a Standard Clause, Cost Table, and Authorisation.
To see how to create Custom Standard Clause Templates click here.
To see how to add authorisation templates to the Inbox email click here.
If you select Cost Table a dialogue box will appear for you to input any cost information associated with EOT. Below is an example;
Once you have entered the information into the cost table, click on Add to return to your email.
5. Add Times Claimed
Add Dates to be claimed. You can add multiple dates and/or a single date.
Simply click on time to be claimed 1/2 day or Full Day, then click the red tick to confirm.
Once you have selected the date range, click Set.
You will be taken back to the body of your email.
Click on the red tick to confirm the dates.
Multiple Dates, click on the Start Section and select the first date for claim. Click on the End section to select the last date to be claimed.
You can edit the time to be claimed for each date by clicking on the pen icon.
Trash icon to delete a date selection.
Time Requested (Days) will automatically be calculated.
Add Last Approved Date
New Comp Date Pending Approval
6. Enter the Email of the Body
Enter your email message into the description field, alternatively, select from a list of Custom templates.
To see how to create Custom Correspondence Templates click here.
Enter the Reason for Extension of Time request (optional).
Enter the effect(s) on the project.
You can manually enter the body of your email, this field is in Html format meaning you can paste text and images directly from word or even your internet browser.
7. Attach Files
Files can be attached to the email directly from Commnia Drive, the document register, from your local device, or drag and drop files with no restriction on file size.
To learn more about how to attach files to email click here.
8. Send EOT
Your email signature will automatically be included in every email communication. You can edit your email signature by clicking on the edit icon.
Each Extension of Time that is created will be logged directly onto the Extension of Time register in Commnia Inbox, to see how to review click here.
Purpose Inbox allows users to conveniently access and review all email communications sent by any contact associated with your company. Moreover, when creating an email within Commnia, any responses received externally will be automatically linked ...
Commnia Transmittals from the Inbox is one of two methods used to send documents. Click here to learn more about our second method, The Transmittal Grid. 1. Navigate to New Transmittal Email Navigate to the menu bar icon and click Inbox under ...
Commnia Inbox allows users to create a Tender Package with its Email functionality utilising document templates and complete traceability. 1. Navigate to New Tender Email Navigate to the menu bar icon and search New Tender. 2. Add Recipients A new ...
Purpose You may set up the email's authorisation section as a standard preamble so it will generate the information on future emails, for example, EOT and other claims. Consideration The Template setup must be complete by a Commnia Administrator ...
Commnia Inbox has been designed to be intuitive and simple to navigate. The new way to manage all your company and project-related communication. 1. Overview All communications are stored within a single repository giving you complete transparency of ...