Besides searching, the Commnia app lets you walk into the register two ways: by discipline, the trade or consultant that produced the document, and by package, the group a set of documents was issued as. Tap Disciplines or Packages / Labels above the list.
Who can do this: anyone with Document Register access on the project. Some actions, such as accepting documents or deleting them, need extra rights from your Commnia administrator.
| Discipline | Package |
|---|---|
| Who produced the document. | Why or when it was issued. |
| Architectural, Structural, Civil, Hydraulic, Mechanical, Electrical, Fire Services, Landscape. | DA Submission, CC3 Submission, Dial Before You Dig, Tender Issue, a subcontractor's drawings. |
| One per document. | A document can sit in as many packages as it needs. |
Packages do not change a document's review status.
From there you can download the whole discipline, save it for offline use, or send it. See How to Send Documents by Transmittal.
You can also create a QR code or link for a package so people on site reach it with a phone camera. See How to Add Documents to a Package or Location.
No. That is a package. The document's discipline should be the trade that drew it, and the submission should be a package. Ask your document controller to tidy it up on a computer.
Disciplines, document types and statuses are set up on a computer.
Packages are per project. Check you are in the right project, and that no other filter is still on.